MTT-2 Extra Credit Projects
| Date Due | Project Description | Possible Points |
| Sep 22 | Bring in a Professional Manufacturing Print from an outside source with the Alphabet of Lines used identified and labeled. | 10 |
| Sept 27 | Read Unit 2 Alphabet of Lines. Complete the Extra Credit Handout on the Alphabet of Lines. Including questions from page 26 & 30 of the Text, and additional questions on front-and-back. One point subtracted for each wrong answer. |
15 |
| Sept 29 | Visit the Math Tutor Lab in the Library for 45 minutes and get help on fractions. To Verify, on your copy of the first day Math Assessment have the tutor sign his name and indicate the date and time you were in the Lab. |
10 |
| October 4 | Send an e-mail from your El Camino webmail account to Mr. Griffin with MTT-2 and your Name in the Subject Line. This is to make sure you can log onto El Camino computers and qualify for Student software. magriffin@elcamino.edu |
5 |
| October 6 | Text Units 7 & 8 Auxiliary Views and Screw Threads and Review, Pages 130 and 149. One point subtracted for each wrong answer. |
10 |
| October 18 | Get a Free Student Download of AutoDesk Inventor. Show Mr. Griffin the Autodesk Authorization e-mail and create a simple part and drawing (to be discussed) as verification. AutoDesk Free Student Software |
10 |
| October 20 | Text Units 9 & 10 Dimensioning & Tollerancing and Review, Pages 178 and 194. One point subtracted for each wrong answer. |
10 |
| October 27 | Blog or post on a public forum about the El Camino Machine Tool Tech program or the Manufacturing Print Reading class, with a link to: http://southbaymachine.com/MTT2.htm http://southbaymachine.com/default.htm 3 postings, 3 different sites. Examples would be Facebook, CNCZone, CrashSpace, Meetup, Yahoo Yellow Pages, CalgunForum... you guys know how to use google. We will verify by looking at your blogs in class. |
10 |
| November 15 | Read Intro to GD&T Link - Homework 1-10 and do the questions at the end of the chapter. Two points subtracted for each wrong answer. |
10 |
| November 22 | Create a proper multi-view drawing in AutoDesk Inventor, including title-block, of an approved sample block used in class demonstrations and drawing exercises. |
10 |
| December 6 | Deliver an approved block to Mr. Griffin machined to the specifications of an approved engineering print. |
20 |
| Total Possible Extra Credit Points Will Equal 20% of Grade |